The project entails construction of seven godowns on a one and a half acre piece of land in Embakasi, decease Nairobi.

The proposal consists of uniquely designed godowns each with its own frontage that has a small loading bay, doctor an office on two floors and a small service area. Each godown will occupy a plinth area of 450 square mtres.

The godowns will have have a concrete slab floor with steel columns that will be filled up using prefabricated panels to increase the speed of construction.

  • Project Type Industrial
  • Project Cost USD 1 Million